Φ114 mm CPE机组高精度小直径薄壁管的生产

    Production of Hi-precision,Small-sized and Light-wall Pipes with Φ114 mm CPE Pipe Rolling Plant

    • 摘要: 介绍了Φ114 mm CPE机组热轧生产径壁比>27的Φ89 mm×3.2 mm、Φ108 mm×3.5 mm高精度小直径薄壁管的工艺方案及控制措施,分析了其生产控制的难点和重点。试制结果表明:穿孔壁厚偏差控制在7%以内和有效控制顶管工序纵向壁厚波动是保障成品尺寸的前提;热轧生产径壁比>27、外径允许偏差(-0.5%~+0.5%)D、壁厚允许偏差(-9%~+9%)S的高精度小直径薄壁管是可行的。

       

      Abstract: Described in the paper are the process scheme and control measures for production of the Φ89 mm× 3.2 mm and Φ108 mm×3.5 mm hi-precision,small-sized and light-wall pipes with D/S>27 with the Φ114 mm CPE hot-rolling pipe mill.Also analyzed are the control difficulties and key points concerning the production activities. Result of the trial production demonstrates that the preconditions for guaranteeing the finished product dimensions are to get the pierced shell WT deviation within 7%,and properly control the longitudinal WT fluctuation during the push bench process,and that it is practical to use the hot-rolling process to produce the hi-precision,small-sized and light-wall pipe with D/S>27,allowable OD tolerance D as(-0.5%~+0.5%)and allowable WT tolerance S as(-9%~+9%).

       

    /

    返回文章
    返回