column
    Thinking about Pushing forward Healthy Development of Seamless Steel Tube Industry in China
    CHENG Haitao
    2018, 47(5): 1-5.
    Abstract PDF
    Discussion on Suitability for Designated Import of Hi-grade Heat-resistant Steel Pipes/Tubes for Power Plant Boiler Service
    LI Jian, JING Shiyu, YANG Xiaochuan, PU Xiaoming, LIU Hongjie, YANG Jinbing, XIE Xiaoyuan, YANG Huachun
    2018, 47(5): 6-13.
    Abstract PDF
    Study on Welding Technology and Weld Joint Micro-structural Properties of 2205/X65 Clad Pipe
    YANG Yaobin, LIU Yun, TIAN Xiaojiang, SONG Hongbing, ZHANG Wanpeng, Cai Yuchen
    2018, 47(5): 14-18.
    Abstract PDF
    Wear Test to Drill Pipe Joint and 140 Casing as being Operated in High-density Oil-base Mud
    ZHANG Jianbing, GU Tianping, LI Ning, LOU Erbiao, LIU Yingying
    2018, 47(5): 19-23.
    Abstract PDF
    Application of Technique of 1.5 Spiral Space between I nternal and External Welding Points to 2-step Process for Spiral Welded Pipe
    LIU Chil, LI Zhenjin, LIAO Pengfei, CHEN Qiaoming
    2018, 47(5): 24-28.
    Abstract PDF
    Failure Investigation on Piercer Plug Bar Carriage System of Φ177 mm PQF Pipe Mill and Improvement Measures
    JIA Bao
    2018, 47(5): 29-32.
    Abstract PDF
    Analysis of Causes for Cracking of 37CrMnMo Drill Pipe Joint
    YANG Pin, CAO Jingjing
    2018, 47(5): 33-37.
    Abstract PDF
    Analysis of Causes for Fracture of Φ73.02 mm×5.51 mm N80 Non-upset Tubing
    FENG Jie, MA Chunli, HU Ruyi
    2018, 47(5): 38-41.
    Abstract PDF
    Solution of Steel Pipe Splicing with Improved Invasive Weed Algorithm(IWA)
    DU Jianhui, LI Liejun, SHI Liangzheng, HUANG Kejian
    2018, 47(5): 42-44.
    Abstract PDF
    Application of PLC/Converter Technology to Steel Tube Head-tail Alignment and Separation Operation
    TAO Haiyan
    2018, 47(5): 45-51.
    Abstract PDF
    Application of Industrial Robot to Welded Pipe Production
    FANG Wen, CAI Weiwei, LIU Huaguang
    2018, 47(5): 52-54.
    Abstract PDF
    Study on Ultrasonic Testing Method for Longitudinal Inner Surface Flaw of Heavy-wall Seamless Steel Tube
    LI Genshe, YUAN Xinglong, ZHANG Yinliang
    2018, 47(5): 55-58.
    Abstract PDF
    Recognition of Baseline of Uphill Shaping Process for HF Line Welded Pipe
    CAO Guofu
    2018, 47(5): 59-63.
    Abstract PDF
    Discussion on Manufacturing Difficulties Associated with Cold-rolled Finned Stainless Steel Tube for Heat Exchanger(PartⅡ)—Re-discussion on Deterioration of Performance of Stainless Steel Tube by Cold-working Process and Relative Control Measures
    HE Defu, ZHANG Yulan, XU Mingwei, SU Yongqiang, RONG Songru, LUO Jian
    2018, 47(5): 64-71.
    Abstract PDF
    Comparison of Russia-used Standards for Gas/Oil Transportation Welded Pipes with Corresponding Standards as Currently Used in China
    LI Cuiyan
    2018, 47(5): 72-77.
    Abstract PDF