Yin Weiqin, Yu Daimin. A PRELIMINARY DISCUSSION ON EQUIPMENT MODIFICATION OF Φ102mm CPE PUSH BENCH PLANT[J]. STEEL PIPE, 1993, 22(3): 16-19.
    Citation: Yin Weiqin, Yu Daimin. A PRELIMINARY DISCUSSION ON EQUIPMENT MODIFICATION OF Φ102mm CPE PUSH BENCH PLANT[J]. STEEL PIPE, 1993, 22(3): 16-19.

    A PRELIMINARY DISCUSSION ON EQUIPMENT MODIFICATION OF Φ102mm CPE PUSH BENCH PLANT

    • A series of modifications have been made to the equipment of the 0 102mm CPE Push Bench Plant, involving the feeding angle adjustment mechanism of the piercer, Iubrication for the gear seat bearing of the push bench mill as well as provision of a pre-hot centering scrap collection system. All the said modifications have site proven very effective.