CAI Feng, ZHANG Lan-ying, YAN Dao-ying, ZHANG Ke-qin. Development of Database Information Management System forHot-rolled Seamless Steel Tube Production Plan[J]. STEEL PIPE, 2000, 29(1): 48-52.
    Citation: CAI Feng, ZHANG Lan-ying, YAN Dao-ying, ZHANG Ke-qin. Development of Database Information Management System forHot-rolled Seamless Steel Tube Production Plan[J]. STEEL PIPE, 2000, 29(1): 48-52.

    Development of Database Information Management System forHot-rolled Seamless Steel Tube Production Plan

    • Described here are the main aspects of the database information management system for hot-rolled seamless steel tube production plan, including basic composition, operation environment, major functions and role of the system as a whole. The said system will extraordinarily contribute to well-management of the hot-rolled seamless steel tube production plan so as to further enhance the management level in this regard.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return