Wang Hua, Jin Shengli, Wang Hanzhong, Ma Dianxin, Zhang Xuecheng. Design and Application of Dynamic ManagementSystem for Spare Parts[J]. STEEL PIPE, 2004, 33(1): 42-45.
    Citation: Wang Hua, Jin Shengli, Wang Hanzhong, Ma Dianxin, Zhang Xuecheng. Design and Application of Dynamic ManagementSystem for Spare Parts[J]. STEEL PIPE, 2004, 33(1): 42-45.

    Design and Application of Dynamic ManagementSystem for Spare Parts

    • Briefly described in the article is the dynamic management system for spare parts designed and used by No.4 Steel Rolling Plant, Anyang I & S Co., Ltd., focusing on the hardware configuration and the functions. Compared with the convenient spare part management mode, the said dynamic management system is more advanced and more cost-effective. Years-long operation of the system has proven that it is steady and reliable with all the functions satisfactory to the customer requirements.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return