• RCCSE中国核心学术期刊
  • CA、AJ、JST、CSA、IC、EBSCO收录期刊
  • 中国高质量科技期刊金属材料(金属学与金属工艺)领域分级目录期刊
Wang Jingwen. The person Who develops the Hot-rolled Steel Pipe Used as Tubing Coupling Stock[J]. STEEL PIPE, 2003, 32(2): 17-19.
Citation: Wang Jingwen. The person Who develops the Hot-rolled Steel Pipe Used as Tubing Coupling Stock[J]. STEEL PIPE, 2003, 32(2): 17-19.

The person Who develops the Hot-rolled Steel Pipe Used as Tubing Coupling Stock

More Information
  • Revised Date: September 12, 2002
  • Available Online: December 14, 2023
  • It is known that work conditions for the tubing used in oil and natural gas fields are very complicated, thus rather high quality of the pipe is required. Since the tubing coupling is used to connect tubings with threads, stringent requirements are set up for the coupling involving such aspects outside dimensions, connection strength, tightness, comprehensive mechanical properties and corrosion resistance, etc. Likely, rather critical requirements are also specified for the seamless steel tube used as stock of the coupling. Described here in the article is the development of the hot-rolled J55 tube for tubing coupling by Changzhou Baosteel Steel Tube Co., Ltd. with the imported Φ102 mm CPE push bench mill, covering such aspects as manufacturing process flow, technological parameters, technological difficulties concerning the trial manufacture and the countermeasures taken.
  • Related Articles

    [1]WANG Chunkai, LIU Yang. Process Study of CPE Mill for Hot-rolling T91 Seamless Steel Tube[J]. STEEL PIPE, 2019, 48(3): 45-47.
    [2]CHEN Hongqi, ZHUANG Gang. Discussion on Manufacturing Process of CPE Mill for Stainless Steel Tube and Titanium Alloy Tube[J]. STEEL PIPE, 2018, 47(2): 35-39.
    [3]LI Qun. Discussion on Modification of CPE Process[J]. STEEL PIPE, 2015, 44(5): 71-73.
    [4]Peng Longzhou, Duan Wei, Yu Bangjian. Discussion on Characteristics and Development Trend of CPE Process[J]. STEEL PIPE, 2012, 41(4): 12-17.
    [5]Zhang Jiming. Improvement of Tube-end Pointing Process of CPE Pipe Plant and Operation Effectiveness[J]. STEEL PIPE, 2010, 39(2): 37-40.
    [6]Yin Weiqin, Yu Daimin, Wang Jingwen. Modification Concerning Pointing Process of The First Domestic CPE Pipe Mill[J]. STEEL PIPE, 2002, 31(6): 16-18.
    [7]Liu Chengping, Chen Benlun, Li Guangjun. DEVELOPMENT AND APPLICATION OF CPE TUBE MILL PLANT[J]. STEEL PIPE, 1997, 26(4): 15-19.
    [8]Ding Dayu, Zheng Zhiping. ADVANTAGES OF CPE PROCESS IN PRODUCTION OF SMALL-SIZED LIGHT WALL SEAMLESS STEEL TUBES[J]. STEEL PIPE, 1996, 25(6): 60-62.
    [9]Wang Jingwen. AN ANALYSIS OF UNEVEN WALL THICKNESS OF HOT ROLLED TUBES PRODUCED BY CPE PUSH BENCH MILL[J]. STEEL PIPE, 1993, 22(4): 14-17.
    [10]Wang Jingwen, Zhang Liang. INITIAL PRACTICE IN THE PRODUCTION OF SEAMLESS STEEL TUBE BY CPE HOT-ROLLING[J]. STEEL PIPE, 1992, 21(3): 25-29.

Catalog

    Article views (11) PDF downloads (9) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return