column
    Review over 2008 Period of and Prospects for 2009 Period of Domestic Weld Pipe Industry
    Wang Xiaoxiang
    2009, 38(3): 1-4.
    Abstract PDF
    Restructure of Seamless Steel Pipe Industry over Recent Years in Russia
    Du Houyi
    2009, 38(3): 5-12.
    Abstract PDF
    Development and Property Analysis of Hi-performance Gas Transmission Linepipes under High Pressure and High Strain(Part I)
    Izumi Takeuchi, Hiroyuki Makino, Hidenori Shitamoto, Shusuke Fujita, Makoto Nagase, Sun Qi, Zhao Bo
    2009, 38(3): 13-16.
    Abstract PDF
    Failure Analysis for Drill Pipe Upset Transition Area
    Zhao Peng, Yu Jie
    2009, 38(3): 17-22.
    Abstract PDF
    Math Model for Solidification Heat-transfer in Continuous Casting of Round Bloom and Application
    Sun Kaiming, Fu Jicheng, Li Jingshe, Wen Desong
    2009, 38(3): 23-27.
    Abstract PDF
    Research on H2S Corrosive Operation Condition for Drill Pipe in G105 Steel
    Xiong Jianxin
    2009, 38(3): 28-32.
    Abstract PDF
    R & D of Φ1219 mm X80 LSAW Linepipe for No.2 West-East Gas Transmission Pipeline Project
    Li Yanfeng
    2009, 38(3): 33-38.
    Abstract PDF
    Research on New Manufacturing Process for Large-medium Sized Hi-alloy Steel Seamless Tubes
    Wang Yaming, Gao Wei, Ma Xiaomei
    2009, 38(3): 39-45.
    Abstract PDF
    Design and Development of Φ382 mm Pass of PQF Mill
    Yue Shibin, Liu Yongli, Guo Huoxing
    2009, 38(3): 46-48.
    Abstract PDF
    Design of Angle-changeble Supporting Block for Straightening of Light-wall Steel Tubes
    Wang Qingzhu, Wang Jiacong, Sun Yonghong
    2009, 38(3): 49-50.
    Abstract PDF
    Computerized 3-D Design Method for Guide Shoe of Cone Type Rotary Reeling Mill
    Luo Tao, Zheng Shijian, Luo Can, Wu Yunna
    2009, 38(3): 51-55.
    Abstract PDF
    Studies on Tensile Test to Steel Linepipe
    Sun Hong
    2009, 38(3): 56-58.
    Abstract PDF
    Application of SIMATIC TDC Control System to Roll Gap Control of FQM Mill
    Yang Huaying
    2009, 38(3): 59-62.
    Abstract PDF
    Analysis and Comparison Concerning Advantages and Disadvantages of Single-forming Process and Continuous Forming Process for Medium-sized ERW Pipe Mill(PartⅡ)
    Wang Sanyun, Zhao Jia
    2009, 38(3): 63-68.
    Abstract PDF
    Analysis of North American OCTG Market in 2008 and Forecasting of Future Demand
    Li Haoming, Wei Lin, Chen Xianhong, Liu Feng, Luo Weiguo
    2009, 38(3): 69-73.
    Abstract PDF
    MCC LIAONING DRAGON PIPE INDUSTRIES CO., LTD.
    2009, 38(3): 74-74.
    Abstract PDF